Overview

OCS combines specialist cleaning and technical handover support at a data centre in Indonesia, keeping live data halls clean while construction of the wider facility continues.

Services

Hard services
Deep cleaning
Cleaning
Pantry services
Pest control
Landscaping

Indonesia

At a Glance

  • 1

    Site

    Live data halls alongside ongoing construction

  • 15+

    Onsite Colleagues

    Specialist cleaning and hard services teams

  • 15 MW

    Planned Capacity

    Phased handovers from construction to operation

Technician in a white hard hat and yellow safety vest inspecting network cables in a server rack while holding a clipboard

Maintaining Active Data Halls Alongside Construction

A data centre operator needed facilities support at a developing site in Indonesia. Parts of the facility were operational while construction continued nearby, creating a need to maintain strict cleanliness standards amid ongoing building activity and construction traffic.

The customer also required support with partial handovers. Equipment installations and operational readiness needed to meet defined standards as different areas moved from construction towards operation.

How OCS Delivered

OCS colleague in a light blue uniform using the touchscreen on a cleaning robot in a modern building corridor

OCS introduced robotic cleaning inside the data halls to improve productivity and allow colleagues to focus on other critical areas while construction traffic remained high. Structured cleaning protocols supported cleanliness in the active operational spaces.

A specialist team removed substantial construction debris immediately after building activities finished. This supported a clean and safe environment as work progressed through the facility.

A technician in a white hard hat and dark uniform using a tablet to inspect a large industrial electrical control panel.

The hard services team focused on asset registration and validation during the ongoing handover process. This helped bridge gaps where information from the project team was still pending.

Alongside this work, the team assisted the customer in supervising handover stages, checking that equipment installations and operational readiness met the required standards and expectations.

A person holding a laptop stands in a dark, modern server room, examining tall racks filled with servers and blinking indicator lights.

OCS deployed E-cleaning and a computerised maintenance management system to track and monitor performance. These systems supported delivery alongside the cleaning, asset validation and handover activities taking place on site.

Close coordination between these activities supported the transition between construction and operation, helping minimise risks and accelerate readiness.

A modern data center hallway with glass walls on one side, revealing rows of illuminated server racks and computer equipment glowing with blue lights. The space is clean, high-tech, and well-lit.
Data centre hall with rows of white server cabinets, overhead yellow cable trays and bright ceiling lights

Outcomes for the Customer

  • Improved cleanliness in active data halls through structured protocols and robotic cleaning.
  • Smoother phased handovers through coordination and technical supervision.
  • Support for operational readiness through asset registration and validation.
  • Reduced transition risk while construction and operational activities continued alongside one another.
  • A solid orange rectangle fills the entire image. There are no visible patterns, text, or objects.

    15 MW Planned Capacity

  • 15+ Onsite Colleagues

An electrician wearing a hard hat with a face shield uses a multimeter to test a complex electrical control panel with color-coded wiring.

Discuss Your Data Centre Facilities

Speak to our team about facilities support during data centre construction, phased handover and operational start-up.

Frequently Asked Questions

  • OCS provided facilities support at a developing data centre site in Indonesia where live data halls operated alongside ongoing construction. More than 15 onsite colleagues from specialist cleaning and hard services teams kept operational areas clean, removed construction debris and supported phased handovers towards 15 MW of planned capacity.

  • OCS introduced robotic cleaning inside the data halls to improve productivity and let colleagues focus on other critical areas while construction traffic remained high. Structured cleaning protocols supported cleanliness in the active operational spaces, and a specialist team removed construction debris immediately after building activities finished.

  • The hard services team registered and validated assets during the ongoing handover process, helping bridge gaps where information from the project team was still pending. The team also helped the customer supervise handover stages, checking that equipment installations and operational readiness met the required standards and expectations.

  • OCS deployed E-cleaning and a computerised maintenance management system to track and monitor performance. These systems supported the cleaning, asset validation and handover activities on site, and close coordination between those activities supported the transition from construction to operation, helping minimise risks and accelerate readiness.

Connect with your OCS team

We believe that every human being deserves the best conditions and opportunities for success. Our team are ready to discuss how we can help you turn possibilities into realities through exceptional facilities management.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.