99.93% Service-Level Score Reported at a Hyperscale Data Centre in Indonesia

2 Minute Read

Sector

Data Centres

Services

Integrated Facilities Management

Key Criteria

Resilience

Region

Indonesia

OCS technician in a hard hat beside a generator in a plant room

Executive Summary

OCS Indonesia delivers facilities management for a leading hyperscale data centre operator in Indonesia, with a 99.93% SLA score reported against a 98% target in July.

The campus spans approximately 65,000 square metres and is designed to support up to 75 MW of IT capacity. OCS combined Facilities Management Agent (FMA) governance of critical systems with building management services in one operating model, mobilised within a one-month implementation period.

Data Centre Performance in Numbers

Figures from the July reporting period show how FMA governance and building management performed at an Indonesian hyperscale data centre.

One-Month Mobilisation
  • 99.93%

    FMA SLA Score Against 98% Target

  • 99%

    Workforce Hours Achieved, July Reporting Period

  • 100%

    Monitored System Availability, Data Halls

OCS Indonesia technician in a hard hat beside a water pump station

The Challenge

As a newly operational hyperscale data centre, the customer needed a partner able to govern critical facility activities, coordinate specialist maintenance suppliers, manage building services and provide clear evidence of performance through structured reporting and service-level controls.

The operating model also had to support rapid growth and stringent uptime expectations, with disciplined procedures, safe working practices and consistent standards across critical and non-critical areas. It had to be fully operational within an aggressive implementation timeline and protect availability and environmental conditions in mission-critical areas.

OCS technician in a hard hat using a tablet to check switchgear panels

The Solution

OCS Indonesia mobilised its operating model within a one-month implementation period.

A Facilities Management Agent (FMA) team oversees critical systems day to day, monitoring cooling, electrical, power backup, control and fire-suppression systems, identifying abnormalities and coordinating incidents. OCS governs preventive maintenance by specialist suppliers rather than acting as sole executor, validating schedules, coordinating access, confirming documentation, tracking execution and escalating deviations.

Cleaning, gardening, facade cleaning, building maintenance technicians and security work under one building management governance structure. SLA and SLG measures, daily and monthly reporting and root-cause analysis turn field activity into management information.

The FMA SLA score was 99.93% against a 98% target in the July reporting period.

Bright, clean data hall with rows of white server cabinets

Best Outcomes

The integrated FMA and building management model protects critical operations, improves service control and generates information for better management decisions. The figures below come from specific reporting periods and are not guarantees of future results.

99.93% FMA SLA score reported against a 98% target in July.
100% monitored availability, with no power breakdown or downtime recorded for Data Halls.
Preventive maintenance completion of 97.57%, with gaps attributed to project and access restrictions.
Building technical performance moved from 90% in June to 100% in August.

Discuss Your Hyperscale Data Centre Operations

Tell us about your campus, critical systems and uptime requirements, and our team will discuss a practical approach.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.